Trackwork at the Hoot Valley complex shows #8 limestone gravel roadbed underlying the #9 limestone ballast. The near track is the mainline and the other is the lumber-yard and engine-service siding. (The mainline runs through the train-storage shed in the background.) Don Parker Now it’s time to get that track onto prepared roadbed […]
How to lay flex track
