Home » Modeling concrete railroad bridges with real cement

Modeling concrete railroad bridges with real cement

By Angela Cotey | February 2, 2010

| Last updated on November 20, 2020


Anchor-bolt cement and styrene sheet molds are all you need to model these precast railroad structures

A precast concrete bridge spans a small creek on the Florida Midland RR.
A precast concrete bridge spans a small creek on the Florida Midland RR. Lance Mindheim describes how he modeled this bridge using anchor-bolt cement and styrene sheet molds.

Replicating the color striations, texture, chips, and cracks of concrete with paint and styrene is tricky at best. On the flip side, the texture of most concrete products is too coarse for modeling applications. However, I was able to make my own HO scale prefabricated concrete bridges using Sakrete anchor-bolt cement and styrene sheet molds.

Anchor bolt cement is a concrete-based product that has a finer grain than regular concrete. It’s an ideal modeling medium because it dries to the same colors as real concrete and replicates its texture without looking out of proportion.

Though the project shown here is HO scale, you can use this technique in any scale to model a variety of precast concrete products. In my article “3 common culverts,” featured in How to Build Realistic Layouts: Model the Trackside Scene, I described how to model a culvert. But don’t stop there. Other precast items you can model include bridge beams, structure foundations, warehouse walls, and pipes.

Making and casting molds
I was able to find a wealth of information, including prototype photos and drawings, on the Web sites of various manufacturers of precast products.

While studying the photos, I noticed that most precast concrete structures are utilitarian, where function and cost rule over form. As such, I didn’t worry about making the bridge too fancy from an esthetic standpoint.

Fig. 1 Styrene mold
Fig. 1 Styrene mold
Using these resources as a guide, I made a simple mold, as shown in fig. 1. With the molds completed, I mixed the anchor-bolt cement.
Fig. 2 Mixing the concrete. Lance filled a plastic cup about 1/3 full of powdered cement then slowly added water.
Fig. 2 Mixing the concrete. Lance filled a plastic cup about 1/3 full of powdered cement then slowly added water. The mix should have the consistency of a thick milk shake.
First, I filled about 1/3 of an 8-ounce plastic cup with dry cement powder. I then slowly added water and stirred the mix with a spoon until it was the consistency of a thick milk shake. The finished mix is shown in fig. 2.
Fig. 3 A filled mold. After pouring thin layers of cement into the mold, Lance let the casting dry for 24 hours.
Fig. 3 A filled mold. After pouring thin layers of cement into the mold, Lance let the casting dry for 24 hours. He placed the mold on a flat surface to ensure the casting would be level.
Next, I poured thin layers of the mix into the styrene. The styrene is slick, so I didn’t use a mold-release agent. I tapped the mold before pouring each layer to get rid of the air bubbles. After the mold was filled (fig. 3), I placed a small sander against it for approximately 30 seconds so its vibrations would release any remaining bubbles.

Finished castings
Though the anchor-bolt cement hardens in 30 minutes, I let it dry for 24 hours before pulling the castings from the molds. Since the molds were easy to make, I wasn’t overly concerned if they were damaged while removing the castings. However, I carefully pried the styrene back and gently twisted the mold so I wouldn’t break the casting.

If a casting should break, don’t worry. The breaks are generally clean, and the broken pieces can be cemented together with cyanoacrylate adhesive (CA).

Finishing touches
After removing the castings from the molds, I inspected each one for air bubbles. I filled the bubbles by putting a small amount of fresh cement on my fingertip and working it into the hole in a circular motion. I wiped off excess cement with a damp cloth.

I then set the bridge into the scene and placed the flextrack over the bridge deck. Though the bridge is a one-piece casting, you can easily attach multiple castings using a gel-type CA or hot glue.

Fig. 4 Finished casting. Here is the finished bridge removed from the mold. The anchor-bolt cement has dried to a realistic color and texture.
Fig. 4 Finished casting. Here is the finished bridge removed from the mold. The anchor-bolt cement has dried to a realistic color and texture.

The finished casting (see fig. 4) represents a relatively new precast bridge. With a bit of weathering, you can give the bridge a light gray or tan appearance, similar to that of aged concrete.

Whether you need a precast concrete culvert or a loading dock [for the latter, see How To Build Realistic Layouts: Freight Yards. -Ed.], these casting techniques will work well for a variety of applications. And you’ll be using real cement, so you’ll end up with prototypical colors without any painting.

Share this article