Before he could pour the resin water on the layout, David needed to finish installing the bridges over the river. In Build a River Part 3B, he shows you the final steps for completing the the through-girder bridge and the pile trestle. To see how to pour the resin, check out part 3A, and look for the four-part Build a Bridge series elsewhere on MR Video Plus.
Thin Branch Series: Build a river part 3B – Installing bridges
| Last updated on November 7, 2022