Having trouble viewing this video? Please visit our Video FAQ page
In this episode of IMRR, host Steve Brown works on his N scale Port Smith to paint, weather, and ballast the trackwork, add a grade crossing, repaint the pavement, install structures, and lay down the base for the river. All this is done the “Regular Guy” way, so you’ll see plenty of twists, turn, and even a water “rescue” along the way!
